PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing sprinkler branches and heads at the 4th floor Facing East.jpg Installing sprinkler branches and heads at the 4th floor Facing North.jpg Laying out block at Corridor 149 Facing South-East.jpg Installed fleeceback at the high roof Facing West 1.jpg Installed fleeceback at the high roof Facing West.jpg
Previous page Installed fleeceback at the high roof Facing West
Installed fleeceback at the high roof Facing West